Innovations in the power sector | British Power International

Innovations in the power sector

 

Join us on Wednesday 14th September 2016 at the offices of SONI, Belfast to learn about the unique innovations British Power International has developed. The session will be interactive and we welcome your feedback throughout the day as we have done at previous events. 

As the award-winning power sector design consultancy, we offer a complete 11kV-400kV design service for substations, renewables and overhead lines. Our innovative solutions provide many benefits to both you and your customers.

 

POC-MAST

Innovative solution for grid connection

  • Connect to the grid for half the cost of a new tower and without the need for an OHL diversion
  • Minimise risk to site personnel
  • Minimum outage requirements
  • It is a low maintenance solution
  • Minimum environmental and visual impact
  • Minimum footprint
  • Cost and time effective
DT addressing audience at ENW tech day

Protean

Wood pole replacement system

 
  • Carry conductors up to 500mm2
  • Customise the design at concept stage
  • Unique hinge system which can be assembled at ground height
  • Utilise LiDAR to provide high accuracy profiles
  • Complete design pack
 

 Aerial survey

Utilising the latest LiDAR technology for inspection and overhead line survey/design

 

  • 100km per day can be surveyed with a 200m wide swathe
  • BPI has completed over 1,000km of overhead line survey
  • BPI has also completed over 35m² of substation/civils infrastructure
  • The LiDAR survey specification allows it to be tailored to the needs of the project
 

Battery storage integration

A complete design service for energy storage integration

  • Design the battery building using the latest Primtech software
  • Provide a complete design for energy storage integration

 

 

 

AGENDA

 
       

0945

 

Coffee on arrival

 

1000

 

Introduction

 For further information on our design services please click here.

1015

 

Protean, including Q&A

 For further information on our products please click here.

1115

 

Break

To view videos of our work please click here

1130

 

POC-MAST, including Q&A

 

1300

 

Lunch

 

1345

 

UAV and helicopter based LiDAR for data capture and asset inspection

 

1415

 

Battery storage integration

 

1445

 

Final Q&A

 

1500

 

Close

 

 

Date:

Venue:

Wednesday 14 September 2016

SONI Limited, 12 Manse Road, Belfast, BT6 9RT.

We look forward to welcoming you to the day and understanding how our solutions fit with your business and projects.

 

 

Construction News Specialist Awards 2015 Winner National Electricity Registration Scheme Accredited The Institution of Engineering and Technology accredited scheme Certificate Number 5467 ISO9001 ISO14001 OHSAS18001 Certificate number 3639 ISO27001 UVDB - empowered by AchillesUK Energy Innovation Awards 2015 Finalist UK Energy Innovation Awards 2016 Finalist
© BPI 2017 | BPI author: Claire Briody | Design and Development: Mosaic PR & Digital